You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Kali Cijantung Rampung

Cijantung River Sheet Pile Repair Finally Completed

It has been ongoing since two weeks and today is completed

The Cijantung River sheet pile repair work in RT 05/05, Cijantung Urban Village, Pasar Rebo has finally completed today, Thursday (9/24).

Pasar Rebo Sub-district Vice Head Santoso said it was carried out as the sheet pile experienced collapse due to scouring of water.

94 Drainage Points Repaired in North Jakarta

"It has been ongoing since two weeks and today is completed," he expressed, Thursday (9/24).

To repair the sheet pile as long as 20 meters with 3 meters high, his party sent seven personnel of East Jakarta Water Resources (SDA) Task Force to the location.

"Repair is done by installing a gabion to make sheet pile stronger, which aims to withstand inundation and flooding in the region," he stated.

Linked News
Popular News indeks
  1. Transjabodetabek PIK 2-Blok M Route Serves 1.4 Million Passengers

    access_time24-05-2026 remove_red_eye1840 personAldi Geri Lumban Tobing
  2. Kultura Market in Pademangan Barat Attracts Crowds

    access_time22-05-2026 remove_red_eye1122 personAnita Karyati
  3. West Jakarta to Host Career Day Walk-in Interviews Next Week

    access_time21-05-2026 remove_red_eye1092 personBudhi Firmansyah Surapati
  4. Jakarta Government Hosts Jakarta Sales Mission in China

    access_time25-05-2026 remove_red_eye691 personAldi Geri Lumban Tobing
  5. Commission E Pushes for Evaluation of Free Private School Program

    access_time25-05-2026 remove_red_eye626 personFakhrizal Fakhri