You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Kali Cijantung Rampung
.
photo Nurito - Beritajakarta.id

Cijantung River Sheet Pile Repair Finally Completed

It has been ongoing since two weeks and today is completed

The Cijantung River sheet pile repair work in RT 05/05, Cijantung Urban Village, Pasar Rebo has finally completed today, Thursday (9/24).

Pasar Rebo Sub-district Vice Head Santoso said it was carried out as the sheet pile experienced collapse due to scouring of water.

94 Drainage Points Repaired in North Jakarta

"It has been ongoing since two weeks and today is completed," he expressed, Thursday (9/24).

To repair the sheet pile as long as 20 meters with 3 meters high, his party sent seven personnel of East Jakarta Water Resources (SDA) Task Force to the location.

"Repair is done by installing a gabion to make sheet pile stronger, which aims to withstand inundation and flooding in the region," he stated.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye553 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye445 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti